Home › Case studies › Automotive Power Distribution & Substation Upgrade
Case study

Automotive Power Distribution &
Substation Upgrade

Upgrading critical power infrastructure within a live automotive manufacturing facility.

SectorAutomotive / power infrastructure
Solution2 substations
DeliveryElectrical infrastructure · HV power distribution · Transformer & switchgear installation · Substation upgrades · Testing & commissioning
Electrical distribution design diagram for the automotive power infrastructure upgrade.
Electrical distribution design diagram for the automotive power infrastructure upgrade.

Project Overview

DACS was appointed to deliver electrical infrastructure and power distribution works for an automotive manufacturing facility. The project involved upgrades to two substations and the associated distribution systems while coordinating work around the requirements of an operational production environment.

The programme required detailed planning, integration with existing electrical infrastructure, and careful sequencing of installation and commissioning activities to support continuity of site operations.

The Challenge

The works involved high-voltage and low-voltage distribution equipment, electrical interfaces and existing infrastructure in a live industrial environment. The design and delivery approach needed to accommodate restricted access, planned shutdown windows and the requirements of the wider facility.

Coordinating multiple elements of the power distribution upgrade was essential to ensure that installation, testing and energisation could be carried out safely and effectively.

Power distribution schematic showing the arrangement of electrical infrastructure and substation connections.
Power distribution schematic showing the arrangement of electrical infrastructure and substation connections.

DACS Solution

Power Distribution

DACS supported the electrical distribution works, coordinating new equipment and connections with the existing site infrastructure and the project programme.

Critical Supply Relocation

The electrical works included the planning and coordination of critical supplies so that essential facility systems could be maintained or transferred through agreed stages of the upgrade.

Substation 23 Upgrade

The scope included electrical installation and upgrade works within the first substation, together with associated distribution equipment, protection interfaces and commissioning activities.

Substation 24 Upgrade

The second substation was also upgraded as part of the wider distribution programme, with equipment installation, electrical integration and testing coordinated around the site’s operational requirements.

Protection, Switchgear & Electrical Infrastructure

HV/LV Inter-Tripping & Protection

The project incorporated protection and inter-tripping requirements to coordinate the operation of the electrical distribution equipment and ensure the intended response to electrical faults.

Switchboard Installation

Electrical switchboards and associated distribution equipment were installed and integrated into the facility infrastructure. The works required coordination of equipment positioning, cable routes, connections and site access.

Busbar Removal

Existing busbar infrastructure was addressed as part of the upgrade works, with removal and alterations coordinated to suit the new electrical distribution arrangement.

Earthing & Bonding

Earthing and bonding requirements were incorporated into the installation and verification work to support the safe operation of the completed electrical system.

Power System Study & Commissioning

Power System Study & Arc Flash Analysis

The electrical engineering scope included power system assessment and study work to support equipment selection, protection coordination and safe operation of the upgraded distribution infrastructure.

  • Load assessment and system review
  • Protection coordination study
  • Arc-flash risk assessment
  • Electrical distribution verification
  • Support for equipment settings and installation

Testing & Commissioning

Testing and commissioning were planned to verify the installed equipment and its interfaces before energisation and handover.

  • Site acceptance inspections
  • Primary and secondary injection testing where required
  • Protection relay verification
  • HV/LV inter-tripping and interface testing
  • Electrical installation testing
  • Commissioning records and handover documentation

The Result

The project delivered upgrades to two substations and associated power distribution infrastructure within an operating automotive manufacturing environment.

By coordinating the engineering, installation and commissioning activities around site requirements, DACS supported the delivery of a more robust electrical infrastructure for the facility.